Turnkey buildings for egg production in voliere

Renovation of two buildings in 2012 :

  • Ground floor (former manure storage) : Volières Natura Floor
  • First floor : Volières Natura Step
Volières Natura Step
Volières Natura Step
Volières Natura Step
Volières Natura Step
Volières Natura Floor
Volières Natura Floor

Renovation of a 18 000 layers buildin in 2012

Renovation of 2 buildings with volière Natura Step (2011 & 2012)